Skip to content
sailing.directory
ChannelsBoatsAskAbout
🇺🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in
HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

Skip to content
sailing.directory
ChannelsBoatsAskAbout
🇺🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in

Entre Terras e Mares · video

FINALLY STARTING the Pilot House cabinets T1.ep162

July 27, 2025 · 13 min · 390 views

What this video covers

Edgar and Sâmia resume interior cabinetry work on their boat, focusing on installing doors for the galley and Pilot House.▶ 0:00 The process involves sealing wood panels with resin, applying contact glue to both the panels and edge banding, and allowing 15 to 30 minutes for the adhesive to set depending on ambient humidity and temperature.▶ 0:57 To ensure a precise fit, Edgar installs the doors before applying the final laminate finish, which prevents damage to the Formica during structural adjustments.▶ 8:29 He modifies a door frame by replacing a narrow trim piece with a wider support to accommodate hinge clearance and adds a structural reinforcement to prevent warping in a larger door panel.▶ 5:12 The team notes that working with green plywood requires careful management to prevent moisture-induced warping, and cold weather often delays epoxy curing times.▶ 9:14 After a two-month hiatus due to surgery, the pair is gradually re-establishing their workflow while managing the challenges of boat maintenance and project planning for the forward head and guest cabin.▶ 10:32

Watch on YouTube

Still wondering about something aboard?

Put the question to the fleet — the answer comes back written out, with links to the moments it draws on.

Ask the fleet →

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue
sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchNewsletterAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026

HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode