Sven Yrvindvideo

4 Jan 2024 Mock up for water boom, yard and mast getting ready

January 4, 2024 · 3 min · 3K views · Sweden

What this video covers

Sven Yrvind constructs a mock-up mast, yard, and water boom for his small boat in Västervik, Sweden. He utilizes a temporary yard to determine the optimal placement for the halyard, aiming for a 40% attachment point along the spar to balance the rig.0:55 Petter assists with precise measurements using two rulers, or tumstockar, to ensure the mast and yard components align correctly against the roof structure.1:23 Yrvind drills holes into the yard to distribute structural forces over a wider area and plans to install a downhaul from the tube.2:08 The mast assembly sits wedged against the roof to maintain stability during the fitting process.2:15 Despite cold, snowy conditions in Sweden, work continues on the rigging components while Yrvind maintains his fitness routine of cycling and running.2:43 The project focuses on refining the geometry of the spar system before final installation.

Watch on YouTube

More from Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.Oct 2026Nervously Cutting the Divinycell Sheets.Oct 2026Trying to Get the Sheerline Right.Oct 2026More molds up.Oct 2026

From Sven Yrvind — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue