Sailing Squibvideo

Squib's Refit - Sealing plates for hatches - Installing roof hatch - Brass screws for batteries /58

March 14, 2024 · 17 min · 849 views

What this video covers

Fabricating replacement aluminum hatch latches and installing a new deck hatch highlight the ongoing refit of the pocket catamaran Squib. The owner manufactures eight custom 3mm-thick aluminum latches to replace broken originals, using a table saw to cut scrap metal and a file to smooth the edges.1:27 A new deck hatch is installed in the galley area after verifying clearance for existing lines and rigging.5:39 The installation involves cutting the deck, fitting a custom wooden frame, and temporarily sealing the unit with heavy-duty tape to ensure weatherproofing before final bonding with epoxy.11:35 Additionally, the owner replaces short factory bolts on the lithium iron phosphate battery bank with custom-cut 12mm brass screws to accommodate multiple cable lugs, washers, and spring rings.14:14 The project list concludes with sanding wooden frames for a new electrical panel and preparing plywood for a freezer base in the starboard hull.12:41

Watch on YouTube

More from Sailing Squib

Sailing Squib - May 2026/3Sep 2026Sailing Squib May 2026 /2Aug 2026Sailing Squib - Contemporary WitnessJul 2026Sailing Squib - May 2026 /1Jul 2026

From Sailing Squib — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue