Classic Yacht TVvideo

EP06 Transom build and pairing the frames: Building the schooner Malabar IV

June 28, 2025 · 22 min · 8K views

What this video covers

The video is almost entirely garbled speech-to-text noise, with one legible passage: crew member Sam, who came from a furniture-making college in Holland, replaced Remy and Lukas and has been assembling the centreline structure, fabricating bronze bolts to fasten it, assembling frame pairs, and attaching frames and floors to the centreline.11:13 The title indicates the subject is transom construction and frame pairing during the build of the schooner Malabar IV, but the video contains no recoverable detail on those specific processes beyond Sam's role. No measurements, timber species, joinery methods, or tool techniques are described in the legible text. The one concrete fact is that hand-made bronze bolts — fabricated on site — fasten the centreline structure together.11:23

Watch on YouTube

More from Classic Yacht TV

EP13 Fastnet update | Interior layout: Building the schooner MALABAR IVMay 2026EP12 fitting planks: Building the schooner Malabar IVFeb 2026EP11 shaping planks: : Building the schooner Malabar IVJan 2026EP10 Steaming and fitting Green Oak frames: Building the schooner Malabar IVJan 2026

From Classic Yacht TV — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue