Classic Yacht TVvideo
EP06 Transom build and pairing the frames: Building the schooner Malabar IV
28 June 2025 · 22 min · 8K views
What this video covers
The video is almost entirely garbled noise, with one legible passage: crew member Sam, who came from a furniture-making college in Holland, replaced Remy and Lukas and has been assembling the centreline structure, fabricating bronze bolts to fasten it, assembling frame pairs, and attaching frames and floors to the centreline.11:13 The title indicates the subject is transom construction and frame pairing during the build of the schooner Malabar IV, but the video contains no recoverable detail on those specific processes beyond Sam's role. No measurements, timber species, joinery methods, or tool techniques are described in the legible text. The one concrete fact is that hand-made bronze bolts — fabricated on site — fasten the centreline structure together.11:23
More from Classic Yacht TV
From Classic Yacht TV — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



