Sailing Magic Carpetvideo

Could Our Shed Fall??

April 26, 2024 · 23 min · 71K views

What this video covers

Installing an AquaDrive constant velocity (CV) joint on a Cape George Cutter 36 requires precise shaft alignment to prevent excessive wear on the cutlass bearing.4:21 To establish the correct position for the thrust bulkhead, the crew uses a dial gauge indicator to measure the shaft’s vertical and horizontal play within the cutlass bearing.4:33 By dividing the total movement measured by the gauge, they center the shaft and lock it in place using a custom-fabricated device.6:29 A plywood template then marks the exact center point for the final aluminum bulkhead, which will be bolted to the AquaDrive assembly.7:39 Separately, the crew prepares a bowsprit for finishing by installing GRP tubes for chain rollers and hardware, using TotalBoat thickened epoxy cartridges for bonding.13:14 During an uncharacteristic Vancouver snowstorm, the crew clears heavy snow from the boat shed roof to prevent structural failure, as the temporary enclosure is not load-bearing.15:00 Cold temperatures delay final exterior painting, prompting a shift to interior priming and cabinetry work.16:22

Watch on YouTube

Boats in this video

Cape GEORGE 38Their boat

More from Sailing Magic Carpet

Sailing Northern Canada | Alone and at PeaceSep 2026Sailing Northern Canada | Alone on a Long Summers DaySep 2026Sailing Northern Canada | Fishing, Beachcombing.Aug 2026Suddenly, The Boat Wasn't Where We Left It [Ep 3]Aug 2026

From Sailing Magic Carpet — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue