Entre Terras e Maresvideo

CRIAMOS UMA ESTRUTURA PARA A TV DA COZINHA T1.ep178

May 17, 2026 · 18 min · 203 views · São Paulo

What this video covers

Edgar and Sâmia construct a reinforced bulkhead in the cabin to support a television mount, incorporating a shelf for personal items and routing channels for 12V and 110/220V electrical wiring.10:37 The structure uses 4mm and 6mm plywood sheets to accommodate existing mast lighting conduits and wall curves.11:00 To secure the television, the team installs a rigid internal frame behind the bulkhead, utilizing Fast Mount fasteners for the final panel assembly.14:00 Additionally, the crew acquires a portable toilet as a temporary sanitation backup while the boat remains on the hard without a functional holding tank.6:54 The project also includes testing a prototype helm seat, which will eventually feature a custom stainless steel base to allow for future seat height and style adjustments.15:58 The team plans to finalize the cabin finishings and electrical routing for USB-C chargers and lighting before completing the interior paneling.11:53

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue