Classic Yacht TVvideo

EP05 keel casting update: Building the schooner Malabar IV

June 2, 2025 · 7 min · 5K views

What this video covers

Emily Harris is transitioning the ballast keel design for the schooner Malabar IV from cast iron to lead.Watch This change avoids the galvanic corrosion risks associated with using iron in a hull fastened with copper and bronze.0:52 Casting the keel in lead allows for self-fabrication using scrap metal, which eliminates the high upfront cost of professional iron casting and prevents project delays.1:58 Harris plans to source additional scrap lead from a local roofer and perform the pour in May with the assistance of incoming volunteers.3:10 The process requires precise execution, as the mold allows for only one attempt.3:46 Beyond the keel, the project continues with the help of volunteers from the IYRS boat building college and a furniture building program in Holland.5:19 These additions aim to accelerate construction progress while Harris balances the build with her separate boat restoration business.5:54

Watch on YouTube

More from Classic Yacht TV

EP13 Fastnet update | Interior layout: Building the schooner MALABAR IVMay 2026EP12 fitting planks: Building the schooner Malabar IVFeb 2026EP11 shaping planks: : Building the schooner Malabar IVJan 2026EP10 Steaming and fitting Green Oak frames: Building the schooner Malabar IVJan 2026

From Classic Yacht TV — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue