Sailing Umavideo

Keeping the ocean out: Portlights & Hatches installation | Step 454

August 31, 2025 · 33 min · 141K views

What this video covers

The crew of the 36-ft sailboat *Uma* installs new deck hardware, including Lewmar Ocean hatches and Atlantic series portlights, to ensure a watertight cabin top.3:34 To minimize potential leak points, the crew mounts the hatches onto pre-fabricated G10 pedestals, allowing them to thread and bolt hardware directly into the G10 rather than drilling through-bolts into the deck.4:19 They seal the hardware using polyurethane sealant, specifically avoiding butyl tape, which they report failed over time by remaining soft and causing hardware to loosen.11:59 For corrosion resistance, the crew replaces original A2/304 stainless steel bolts with A4/316 grade hardware and applies Tefgel to all connections where stainless steel contacts aluminum.11:24 The installation process also includes re-polishing existing stainless steel components like the bow pulpit, stern arch, and handrails.15:12 When mounting the bow roller, the crew corrects misaligned holes by over-drilling into the plywood core, filling the voids with epoxy, and re-drilling to ensure a sealed, structural fit.21:33

Watch on YouTube

More from Sailing Uma

Solar Sponsor Backed Out Before Sailing Around the World !Sep 2026Our boat won’t look the same after this | Step 495Aug 2026The ONE Thing We Disagreed on This Entire Refit | Step 494Aug 2026We Owe You The Full StoryJul 2026

From Sailing Uma — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue