Sailing Squibvideo
Squib´s Refit - The countdown to departure is on - 100 days to go /64
April 25, 2024 · 38 min · 911 views
What this video covers
Peter and Sabina are preparing their boat, Squib, for departure in 100 days, documenting a extensive four-page to-do list of refit tasks.0:24 The work covers both hulls, the engine rooms, the cockpit, and the interior. Key mechanical tasks include servicing both engines, installing bilge pumps, and mounting a wind vane steering system linked to a tiller pilot.7:14 Electrical upgrades involve installing a 1400-watt solar array, replacing old wiring, mounting an AIS and radar detector, and setting up a 24-switch electrical panel.2:22 The crew is also replacing window seals, installing new glass panes, and outfitting the galley with a fridge, stove, and seawater pump.20:19 Interior work includes insulating and finishing the ceilings, installing a new head, and building a custom sleeping berth over the port engine.2:17 While the couple debates which tasks are essential for being "seaworthy" versus cosmetic, they aim to complete the refit by early August to maximize daylight hours for their upcoming passage.37:09
More from Sailing Squib
From Sailing Squib — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



