Velero Reginavideo

TIG welding work on board. We finally have a gunwale.

May 2, 2023 · 21 min · 3K views · Lanzarote

What this video covers

The crew of Regina replaces the boat's bolted-on toe rails and stanchion bases with a custom-fabricated, TIG-welded stainless steel system.0:09 The new design features a raised mounting configuration that leaves the stanchion bases suspended above the deck, eliminating the water traps that previously caused chronic corrosion.6:28 By removing approximately 300 bolts from the deck perimeter, the refit improves structural rigidity and simplifies future maintenance, as individual components can now be replaced independently.12:30 A professional welder from the company Dima performed the TIG welding, which includes the toe rails, stanchion bases, and deck handrails.9:56 Future plans include installing a custom mast pulpit to assist with sail handling and applying a new non-skid coating using silica sand mixed with paint to replace the worn-out Kiwi Grip.21:20 The project restores the vessel's original profile while significantly increasing the durability of the deck hardware.

Watch on YouTube

More from Velero Regina

The newsAug 2026Azores to the Peninsula. What went wrong?Aug 2026Arrival at Culatra IslandAug 2026Atlantic Crossing. Azores to Peninsula Journey. ArrivalJul 2026

From Velero Regina — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue