Velero Reginavideo
TIG welding work on board. We finally have a gunwale.
2 May 2023 · 21 min · 3K views · Lanzarote
What this video covers
The crew of Regina replaces the boat's bolted-on toe rails and stanchion bases with a custom-fabricated, TIG-welded stainless steel system.0:09 The new design features a raised mounting configuration that leaves the stanchion bases suspended above the deck, eliminating the water traps that previously caused chronic corrosion.6:28 By removing approximately 300 bolts from the deck perimeter, the refit improves structural rigidity and simplifies future maintenance, as individual components can now be replaced independently.12:30 A professional welder from the company Dima performed the TIG welding, which includes the toe rails, stanchion bases, and deck handrails.9:56 Future plans include installing a custom mast pulpit to assist with sail handling and applying a new non-skid coating using silica sand mixed with paint to replace the worn-out Kiwi Grip.21:20 The project restores the vessel's original profile while significantly increasing the durability of the deck hardware.
More from Velero Regina
From Velero Regina — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



