Sailing Yabávideo

Rebuilding our schooner with PURPLE HEART wood! — Sailing Yabá #46

September 19, 2021 · 26 min · 128K views

What this video covers

Shipwrights rebuilding the schooner Yabá in Brazil are constructing double-layered internal bulkheads using Purple Heart hardwood.10:05 The crew is installing these bulkheads forward of the engine room and aft of the forward cabin to provide sound insulation, temperature control, and watertight integrity.10:30 The design incorporates independent bilge pumps for each of the three hull sections.12:03 Carpenters are fitting the planks around existing floor timbers and keelsons, requiring precise templates for each section.13:13 The team is also completing the bulwark columns, using wedges to adjust the angle of the supports before securing them.7:48 To manage workspace and tool storage, the owners purchased a shipping container to serve as an on-site workshop.9:02 The project continues despite cold weather and the need to source materials incrementally.14:44 The crew also performed a mechanical repair on their transport vehicle, fixing a disconnected gear linkage that had prevented the transmission from shifting out of second gear.23:22

Watch on YouTube

More from Sailing Yabá

Yabá gets Brand New Sails & Set Sail Immediately!— Sailing YabáOct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing YabáSep 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáSep 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing YabáSep 2026

From Sailing Yabá — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue