Sailing Yabávídeo

Rebuilding our schooner with PURPLE HEART wood! — Sailing Yabá #46

19 de setembro de 2021 · 26 min · 128K visualizações

O que este vídeo aborda

Shipwrights rebuilding the schooner Yabá in Brazil are constructing double-layered internal bulkheads using Purple Heart hardwood.10:05 The crew is installing these bulkheads forward of the engine room and aft of the forward cabin to provide sound insulation, temperature control, and watertight integrity.10:30 The design incorporates independent bilge pumps for each of the three hull sections.12:03 Carpenters are fitting the planks around existing floor timbers and keelsons, requiring precise templates for each section.13:13 The team is also completing the bulwark columns, using wedges to adjust the angle of the supports before securing them.7:48 To manage workspace and tool storage, the owners purchased a shipping container to serve as an on-site workshop.9:02 The project continues despite cold weather and the need to source materials incrementally.14:44 The crew also performed a mechanical repair on their transport vehicle, fixing a disconnected gear linkage that had prevented the transmission from shifting out of second gear.23:22

Assistir no YouTube

Mais de Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing Yabáout. de 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing Yabáout. de 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabáset. de 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabáset. de 2026

De Sailing Yabá — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema