Project Brupegvideo
Finally launched after a 10 year rebuild - Project Brupeg Ep. 325
October 15, 2023 · 25 min · 224K views
What this video covers
After a 10-year rebuild, the 48-tonne fishing trawler Brewpeg undergoes a successful initial launch and wet test.5:41 The crew performs the launch in two stages, first lowering the vessel into the water while suspended in travel lift slings to inspect for hull leaks and seacock integrity.0:28 During this hour-long test, the team verifies that all fuel tanks and the crash bulkhead remain bone-dry.11:18 A small amount of brown water found in the bilge is identified as a discharge from the keel cooling system rather than a hull breach.10:22 The vessel sits level in the water, requiring only minor ballast adjustments with fuel and water to reach its final design trim.22:20 Following the inspection, the boat is hauled back out for final adjustments before its permanent launch.0:49 The project, funded by community support and volunteer labor, confirms the structural integrity of the hull and the effectiveness of the new engine and gearbox installation.10:50
More from Project Brupeg
From Project Brupeg — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



