Project Brupegvidéo
Finally launched after a 10 year rebuild - Project Brupeg Ep. 325
15 octobre 2023 · 25 min · 224K vues
Ce que couvre cette vidéo
After a 10-year rebuild, the 48-tonne fishing trawler Brewpeg undergoes a successful initial launch and wet test.5:41 The crew performs the launch in two stages, first lowering the vessel into the water while suspended in travel lift slings to inspect for hull leaks and seacock integrity.0:28 During this hour-long test, the team verifies that all fuel tanks and the crash bulkhead remain bone-dry.11:18 A small amount of brown water found in the bilge is identified as a discharge from the keel cooling system rather than a hull breach.10:22 The vessel sits level in the water, requiring only minor ballast adjustments with fuel and water to reach its final design trim.22:20 Following the inspection, the boat is hauled back out for final adjustments before its permanent launch.0:49 The project, funded by community support and volunteer labor, confirms the structural integrity of the hull and the effectiveness of the new engine and gearbox installation.10:50
Plus de vidéos de Project Brupeg
De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



