sailing.directory
ChannelsBoatsAskAbout
🇺🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in
sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026

HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory
ChannelsBoatsAskAbout
🇺🇸
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Sign in

MJ Sailing · video

Diesel Engine Lift on a Catamaran - With EXTREMELY Tight Clearances (MJ Sailing - Episode 370)

December 13, 2025 · 19 min · 31K views · Stevensville, United States

Watch on YouTube

What this video covers

A 600-pound diesel hybrid engine is lifted into a catamaran under severe clearance constraints at a boatyard, with a telehandler borrowed from neighbor Colby, who is simultaneously installing his own engines.▶ 2:56 The first lift attempt fails when the telehandler's carriage proves too tall to clear the cabin top while reaching into the cockpit; the crew removes the carriage, repositions the machine, and reroutes the lifting chains through the telehandler's pivot pin before successfully setting the engine onto a pallet in the cockpit.▶ 5:18 Minor fiberglass damage results and requires a full day or more of sanding to repair.▶ 11:24 Because the boat is a catamaran, the process must be repeated for the second engine.▶ 6:24 Separately, Matt and Jessica continue interior wiring and plumbing conduit work: Matt drills and glasses 1.5-inch fiberglass sleeve inserts into interior bulkheads using TotalBoat Structural Putty to reinforce holes that form a conduit run from Bulkhead 6 through the master head to Bulkhead 5, and Jessica sands and laminates fiberglass strips over the openings from both sides.▶ 13:19 Waiting on electrical components from Vic Chon and Dakota Lithium before pulling wire through the completed conduit.▶ 18:39

More from MJ Sailing

The Details That Keep a Boat Dry (MJ Sailing - Episode 379)Jun 2026Preparing Our Catamaran for Paint—and Me for Captain's SchoolJun 2026The Bad News: We Have To Cut This Bulkhead Out (MJ Sailing - Episode 377)May 2026We Almost Cooked Our Electrical System… So We Fixed It (MJ Sailing - Episode 375)Apr 2026

From MJ Sailing — see the channel’s boat, crew, and every analyzed video.

Report an issue
HomeChannelsBoats

More

SearchAskAboutSupportFor creatorsSign in

Language

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Display mode

sailing.directory

An index of sailing channels on YouTube — searchable by topic, navigable by interest. New channels and boats, indexed weekly. No noise.

Explore

ChannelsBoatsSearchAboutSuggest a channel

Creators & legal

SupportFor creatorsPrivacyTermsDMCA

Not navigation advice · © 2026