Sailing SV Delosvideo

Sailing Hardware Install Begins! - A WHOLE NEW PHASE! (Aluminum Catamaran Build Pt. 39)

June 6, 2025 · 31 min · 645K views

What this video covers

The crew of an aluminum catamaran build project installs sailing hardware, focusing on consolidating all sail control lines into a forward cockpit to keep the aft deck clear for leisure.0:13 To route jib and genoa sheets from the deck to the forward cockpit, the team fabricates recessed channels within the roof’s "eyebrow" structure using welded rectangular hollow sections (RHS).5:32 They mount Rutgersen deck blocks inside these recessed pits to ensure the correct lead angle for 16mm sheets, preventing wear on the block lips.5:49 To maintain a watertight seal on the saloon roof, the team welds aluminum doubler plates to the deck, allowing for tapped holes that do not penetrate the interior.15:24 The project also incorporates a custom lighting design and universal electrical outlets with integrated USB ports throughout the vessel.20:37 The build team hosts a meetup for project patrons to tour the progress on the catamaran’s interior and deck layout.26:40 Proper planning of sheet lead angles and the use of doubler plates for mounting hardware prevents deck leaks while maintaining a clean, functional cockpit layout.

Watch on YouTube

More from Sailing SV Delos

Whatever You Do…Don’t Push This ☠️ Aluminum Catamaran Build Pt. 89Oct 2026This Is Gonna Be SO FREAKING Cool! Aluminum Catamaran Build Pt. 88Sep 2026OUR MAST: The INCREDIBLE Process! (EXTENDED CUT) Building Our Own Aluminum Catamaran Pt. 87Sep 2026You Need to See This 🤯 Building Our Own Aluminum Catamaran Pt. 86Sep 2026

From Sailing SV Delos — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue