GIANT STEP COMPLETED ON OUR OFF GRID JUNGLE PROPERTY!

4 Αυγούστου 2024 · 31 λεπτά · 152K προβολές

Τι καλύπτει αυτό το βίντεο

Construction of a large pergola involves installing a double layer of reed fencing beneath galvanized aluminum roofing panels to achieve a rustic aesthetic.2:02 The project requires securing 24-foot-long, 3-foot-wide metal panels 12 feet above the ground.7:13 To correct a one-inch twist in an 8x8 support post, a ratchet strap anchored to a truck pulls the post into alignment before the roofing panels are fastened, which then locks the structure into a square position.11:57 The reed fencing is stapled to the support beams using three-quarter-inch staples, with temporary catwalks made of 4x4 lumber and scrap metal used to navigate the roof during installation.26:23 Frequent tropical rainstorms and high humidity complicate the work, causing the reed material to soak up water and become difficult to handle.25:31 The project concludes with securing the roofing panels using lag bolts, a process that proves time-consuming without an impact driver.26:46 Proper structural alignment and secure fastening are essential for stabilizing large, awkward roofing materials at height.

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Good, Bad, and Ugly

Infested, Moldy Disaster to Dream Transformation Start to FinishΣεπ 2026IT’S FINALLY DONE!Σεπ 2026We Needed a Win and This Wasn’t ItΑυγ 2026The End Is Finally NearΑυγ 2026

Από Sailing Good, Bad, and Ugly — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος