Sailing Good, Bad, and Uglyvidéo

GIANT STEP COMPLETED ON OUR OFF GRID JUNGLE PROPERTY!

4 août 2024 · 31 min · 152K vues

Ce que couvre cette vidéo

Construction of a large pergola involves installing a double layer of reed fencing beneath galvanized aluminum roofing panels to achieve a rustic aesthetic.2:02 The project requires securing 24-foot-long, 3-foot-wide metal panels 12 feet above the ground.7:13 To correct a one-inch twist in an 8x8 support post, a ratchet strap anchored to a truck pulls the post into alignment before the roofing panels are fastened, which then locks the structure into a square position.11:57 The reed fencing is stapled to the support beams using three-quarter-inch staples, with temporary catwalks made of 4x4 lumber and scrap metal used to navigate the roof during installation.26:23 Frequent tropical rainstorms and high humidity complicate the work, causing the reed material to soak up water and become difficult to handle.25:31 The project concludes with securing the roofing panels using lag bolts, a process that proves time-consuming without an impact driver.26:46 Proper structural alignment and secure fastening are essential for stabilizing large, awkward roofing materials at height.

Regarder sur YouTube

Plus de vidéos de Sailing Good, Bad, and Ugly

BIG SPLURGE IS IT WORTH IT?!sept. 2026Infested, Moldy Disaster to Dream Transformation Start to Finishsept. 2026IT’S FINALLY DONE!sept. 2026We Needed a Win and This Wasn’t Itaoût 2026

De Sailing Good, Bad, and Ugly — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème