Sailing Good, Bad, and Uglyvideo

GIANT STEP COMPLETED ON OUR OFF GRID JUNGLE PROPERTY!

4 de agosto de 2024 · 31 min · 152K vistas

¿Qué cubre este video?

Construction of a large pergola involves installing a double layer of reed fencing beneath galvanized aluminum roofing panels to achieve a rustic aesthetic.2:02 The project requires securing 24-foot-long, 3-foot-wide metal panels 12 feet above the ground.7:13 To correct a one-inch twist in an 8x8 support post, a ratchet strap anchored to a truck pulls the post into alignment before the roofing panels are fastened, which then locks the structure into a square position.11:57 The reed fencing is stapled to the support beams using three-quarter-inch staples, with temporary catwalks made of 4x4 lumber and scrap metal used to navigate the roof during installation.26:23 Frequent tropical rainstorms and high humidity complicate the work, causing the reed material to soak up water and become difficult to handle.25:31 The project concludes with securing the roofing panels using lag bolts, a process that proves time-consuming without an impact driver.26:46 Proper structural alignment and secure fastening are essential for stabilizing large, awkward roofing materials at height.

Ver en YouTube

Más de Sailing Good, Bad, and Ugly

Infested, Moldy Disaster to Dream Transformation Start to Finishsep 2026IT’S FINALLY DONE!sep 2026We Needed a Win and This Wasn’t Itago 2026The End Is Finally Nearago 2026

De Sailing Good, Bad, and Ugly — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema