Sailing Good, Bad, and Uglyvideo

GIANT STEP COMPLETED ON OUR OFF GRID JUNGLE PROPERTY!

4. august 2024 · 31 min · 152K visninger

Hva denne videoen dekker

Construction of a large pergola involves installing a double layer of reed fencing beneath galvanized aluminum roofing panels to achieve a rustic aesthetic.2:02 The project requires securing 24-foot-long, 3-foot-wide metal panels 12 feet above the ground.7:13 To correct a one-inch twist in an 8x8 support post, a ratchet strap anchored to a truck pulls the post into alignment before the roofing panels are fastened, which then locks the structure into a square position.11:57 The reed fencing is stapled to the support beams using three-quarter-inch staples, with temporary catwalks made of 4x4 lumber and scrap metal used to navigate the roof during installation.26:23 Frequent tropical rainstorms and high humidity complicate the work, causing the reed material to soak up water and become difficult to handle.25:31 The project concludes with securing the roofing panels using lag bolts, a process that proves time-consuming without an impact driver.26:46 Proper structural alignment and secure fastening are essential for stabilizing large, awkward roofing materials at height.

Se på YouTube

Mer fra Sailing Good, Bad, and Ugly

Infested, Moldy Disaster to Dream Transformation Start to Finishsep. 2026IT’S FINALLY DONE!sep. 2026We Needed a Win and This Wasn’t Itaug. 2026The End Is Finally Nearaug. 2026

Fra Sailing Good, Bad, and Ugly – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem