Entre Terras e Maresβίντεο

CONSEGUIMOS TERMINAR o Paiol do CAMAROTE DE PROA do barco T1.ep167

22 Φεβρουαρίου 2026 · 9 λεπτά · 293 προβολές

Τι καλύπτει αυτό το βίντεο

Edgar and Sâmia complete the structural installation of storage lockers in the forward cabin of their boat.1:31 The process involves aligning internal supports and installing doors, though final latches and hardware remain pending until the application of laminate finishes.2:03 To ensure moisture protection and structural integrity, the crew applies two coats of gelcoat mixed with paraffin to the interior of the lockers.4:34 Edgar reinforces specific sections with epoxy to ensure durability.1:52 Beyond moisture sealing, the team plans to install thermal insulation blankets on the hull-facing walls to reduce heat transfer from the exterior.4:55 The project also includes finalizing the interior lighting for the cabin berth.1:58 These structural and finishing tasks aim to improve long-term cleanliness and humidity control within the vessel's storage compartments.8:18

Παρακολουθήστε στο YouTube

Περισσότερα από το Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Ιουλ 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Ιουν 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Ιουν 2026This week the focus was on something elseΙουν 2026

Από Entre Terras e Mares — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος