Mais
Idioma
Modo de exibição
Entre Terras e Maresvídeo
22 de fevereiro de 2026 · 9 min · 293 visualizações
O que este vídeo aborda
Edgar and Sâmia complete the structural installation of storage lockers in the forward cabin of their boat. The process involves aligning internal supports and installing doors, though final latches and hardware remain pending until the application of laminate finishes.▶ 2:03 To ensure moisture protection and structural integrity, the crew applies two coats of gelcoat mixed with paraffin to the interior of the lockers.▶ 4:04 Edgar reinforces specific sections with epoxy to ensure durability.▶ 1:32 Beyond moisture sealing, the team plans to install thermal insulation blankets on the hull-facing walls to reduce heat transfer from the exterior.▶ 4:55 The project also includes finalizing the interior lighting for the cabin berth.▶ 2:28 These structural and finishing tasks aim to improve long-term cleanliness and humidity control within the vessel's storage compartments.
Mais de Entre Terras e Mares
De Entre Terras e Mares — veja o barco, a tripulação e cada vídeo analisado do canal.