Entre Terras e Maresvideo

CONSEGUIMOS TERMINAR o Paiol do CAMAROTE DE PROA do barco T1.ep167

22 February 2026 · 9 min · 293 views

What this video covers

Edgar and Sâmia complete the structural installation of storage lockers in the forward cabin of their boat.1:31 The process involves aligning internal supports and installing doors, though final latches and hardware remain pending until the application of laminate finishes.2:03 To ensure moisture protection and structural integrity, the crew applies two coats of gelcoat mixed with paraffin to the interior of the lockers.4:34 Edgar reinforces specific sections with epoxy to ensure durability.1:52 Beyond moisture sealing, the team plans to install thermal insulation blankets on the hull-facing walls to reduce heat transfer from the exterior.4:55 The project also includes finalizing the interior lighting for the cabin berth.1:58 These structural and finishing tasks aim to improve long-term cleanliness and humidity control within the vessel's storage compartments.8:18

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue