Entre Terras e Maresvideo

CONSEGUIMOS TERMINAR o Paiol do CAMAROTE DE PROA do barco T1.ep167

22 febbraio 2026 · 9 min · 293 visualizzazioni

Cosa tratta questo video

Edgar and Sâmia complete the structural installation of storage lockers in the forward cabin of their boat.1:31 The process involves aligning internal supports and installing doors, though final latches and hardware remain pending until the application of laminate finishes.2:03 To ensure moisture protection and structural integrity, the crew applies two coats of gelcoat mixed with paraffin to the interior of the lockers.4:34 Edgar reinforces specific sections with epoxy to ensure durability.1:52 Beyond moisture sealing, the team plans to install thermal insulation blankets on the hull-facing walls to reduce heat transfer from the exterior.4:55 The project also includes finalizing the interior lighting for the cabin berth.1:58 These structural and finishing tasks aim to improve long-term cleanliness and humidity control within the vessel's storage compartments.8:18

Guarda su YouTube

Altro da Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183lug 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182giu 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181giu 2026This week the focus was on something elsegiu 2026

Da Entre Terras e Mares — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema