Sailing Umaβίντεο
Installing Boat Hardware That Doesn't Suck! | Step 455
6 Σεπτεμβρίου 2025 · 26 λεπτά · 161K προβολές
Τι καλύπτει αυτό το βίντεο
The crew of the 40-ft sailboat *Uma* installs new Schaefer deck hardware, including a traveler, jib and genoa tracks, and line organizers.▶ 0:11 To prevent leaks and thermal bridging, the team creates custom G10 backing plates and seals all through-deck bolt penetrations with epoxy caps.▶ 1:28 When installing the traveler pedestals, they use a test nut to ensure proper bolt depth, avoiding over-tightening and stainless steel galling.▶ 6:24 To align the jib tracks with the existing non-skid pattern, they use a 25mm spacer stick to mark the deck before drilling.▶ 10:35 They over-drill holes to 12mm, fill them with epoxy, and re-drill to 8mm to create a protective epoxy donut that isolates the core from the bolts.▶ 16:37 The team applies Tefgel to all stainless-to-aluminum interfaces to prevent galvanic corrosion.▶ 18:20 They emphasize that knowing when to stop tooling caulking joints prevents smearing and results in a cleaner finish.▶ 8:55 The traveler bridge is mounted straight to ensure smooth operation of the 4:1 purchase system.▶ 21:46
Περισσότερα από το Sailing Uma
Από Sailing Uma — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



