Sailing Umavideo
Installing Boat Hardware That Doesn't Suck! | Step 455
6 September 2025 · 26 min · 161K views
What this video covers
The crew of the 40-ft sailboat *Uma* installs new Schaefer deck hardware, including a traveler, jib and genoa tracks, and line organizers.▶ 0:11 To prevent leaks and thermal bridging, the team creates custom G10 backing plates and seals all through-deck bolt penetrations with epoxy caps.▶ 1:28 When installing the traveler pedestals, they use a test nut to ensure proper bolt depth, avoiding over-tightening and stainless steel galling.▶ 6:24 To align the jib tracks with the existing non-skid pattern, they use a 25mm spacer stick to mark the deck before drilling.▶ 10:35 They over-drill holes to 12mm, fill them with epoxy, and re-drill to 8mm to create a protective epoxy donut that isolates the core from the bolts.▶ 16:37 The team applies Tefgel to all stainless-to-aluminum interfaces to prevent galvanic corrosion.▶ 18:20 They emphasize that knowing when to stop tooling caulking joints prevents smearing and results in a cleaner finish.▶ 8:55 The traveler bridge is mounted straight to ensure smooth operation of the 4:1 purchase system.▶ 21:46
More from Sailing Uma
From Sailing Uma — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



