Sailing Umavídeo

Installing Boat Hardware That Doesn't Suck! | Step 455

6 de setembro de 2025 · 26 min · 163K visualizações

O que este vídeo aborda

The crew of the 40-ft sailboat *Uma* installs new Schaefer deck hardware, including a traveler, jib and genoa tracks, and line organizers.0:11 To prevent leaks and thermal bridging, the team creates custom G10 backing plates and seals all through-deck bolt penetrations with epoxy caps.1:28 When installing the traveler pedestals, they use a test nut to ensure proper bolt depth, avoiding over-tightening and stainless steel galling.6:24 To align the jib tracks with the existing non-skid pattern, they use a 25mm spacer stick to mark the deck before drilling.10:35 They over-drill holes to 12mm, fill them with epoxy, and re-drill to 8mm to create a protective epoxy donut that isolates the core from the bolts.16:37 The team applies Tefgel to all stainless-to-aluminum interfaces to prevent galvanic corrosion.18:20 They emphasize that knowing when to stop tooling caulking joints prevents smearing and results in a cleaner finish.8:55 The traveler bridge is mounted straight to ensure smooth operation of the 4:1 purchase system.21:46

Ver no YouTube

Mais de Sailing Uma

Making Our Small Cockpit Twice as Useful | Step 49710/2026We Ditched Our Steering Wheel (And Built Something Better) | Step 49609/2026We're Finally Setting Sail Again!09/20264 Hours to Rig Solar for an 8-Month Solo Circumnavigation09/2026

De Sailing Uma — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema