Sailing Umavidéo

Installing Boat Hardware That Doesn't Suck! | Step 455

6 septembre 2025 · 26 min · 162K vues

Ce que couvre cette vidéo

The crew of the 40-ft sailboat *Uma* installs new Schaefer deck hardware, including a traveler, jib and genoa tracks, and line organizers.0:11 To prevent leaks and thermal bridging, the team creates custom G10 backing plates and seals all through-deck bolt penetrations with epoxy caps.1:28 When installing the traveler pedestals, they use a test nut to ensure proper bolt depth, avoiding over-tightening and stainless steel galling.6:24 To align the jib tracks with the existing non-skid pattern, they use a 25mm spacer stick to mark the deck before drilling.10:35 They over-drill holes to 12mm, fill them with epoxy, and re-drill to 8mm to create a protective epoxy donut that isolates the core from the bolts.16:37 The team applies Tefgel to all stainless-to-aluminum interfaces to prevent galvanic corrosion.18:20 They emphasize that knowing when to stop tooling caulking joints prevents smearing and results in a cleaner finish.8:55 The traveler bridge is mounted straight to ensure smooth operation of the 4:1 purchase system.21:46

Regarder sur YouTube

Plus de vidéos de Sailing Uma

Solar Sponsor Backed Out Before Sailing Around the World !sept. 2026Our boat won’t look the same after this | Step 495août 2026The ONE Thing We Disagreed on This Entire Refit | Step 494août 2026We Owe You The Full Storyjuil. 2026

De Sailing Uma — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème