Sven Yrvindβίντεο

Fixing water collection and trailer adaption.

4 Σεπτεμβρίου 2026 · 5 λεπτά · 8K προβολές

Τι καλύπτει αυτό το βίντεο

Sven Yrvind modifies a boat trailer to accommodate a transition from a single-keel configuration to a twin-keel setup.Watch He drills mounting holes into two heavy steel channels using a drill press to secure the new keel supports onto the trailer frame.0:38 The project also involves installing a rain-collection system designed to capture water from the boom. Yrvind fits collection components to the boom, adjusting the length of the hardware to ensure proper clearance and function. He removes existing screws to clear space for the new assembly and replicates the installation on both sides of the vessel. The system operates by unscrewing caps to allow rainwater to flow into the collection apparatus. Yrvind notes that he intends to let the initial rainfall wash away salt buildup from the rigging before collecting water for drinking purposes.

Παρακολουθήστε στο YouTube

Περισσότερα από το Sven Yrvind

A Non Bloated Boat in a Bloated World.Σεπ 2026No access to boat sat and sunday.Σεπ 2026The Trailer and a Slip for the Boat.Σεπ 2026Aft Sail Up.Σεπ 2026

Από Sven Yrvind — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος