Sven Yrvindvidéo

Fixing water collection and trailer adaption.

4 septembre 2026 · 5 min · 7K vues

Ce que couvre cette vidéo

Sven Yrvind modifies a boat trailer to accommodate a transition from a single-keel configuration to a twin-keel setup.Watch He drills mounting holes into two heavy steel channels using a drill press to secure the new keel supports onto the trailer frame.0:38 The project also involves installing a rain-collection system designed to capture water from the boom. Yrvind fits collection components to the boom, adjusting the length of the hardware to ensure proper clearance and function. He removes existing screws to clear space for the new assembly and replicates the installation on both sides of the vessel. The system operates by unscrewing caps to allow rainwater to flow into the collection apparatus. Yrvind notes that he intends to let the initial rainfall wash away salt buildup from the rigging before collecting water for drinking purposes.

Regarder sur YouTube

Plus de vidéos de Sven Yrvind

A Non Bloated Boat in a Bloated World.sept. 2026No access to boat sat and sunday.sept. 2026The Trailer and a Slip for the Boat.sept. 2026Aft Sail Up.sept. 2026

De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème