Sven Yrvindvideo

Fixing water collection and trailer adaption.

4 settembre 2026 · 5 min · 8K visualizzazioni

Cosa tratta questo video

Sven Yrvind modifies a boat trailer to accommodate a transition from a single-keel configuration to a twin-keel setup.Watch He drills mounting holes into two heavy steel channels using a drill press to secure the new keel supports onto the trailer frame.0:38 The project also involves installing a rain-collection system designed to capture water from the boom. Yrvind fits collection components to the boom, adjusting the length of the hardware to ensure proper clearance and function. He removes existing screws to clear space for the new assembly and replicates the installation on both sides of the vessel. The system operates by unscrewing caps to allow rainwater to flow into the collection apparatus. Yrvind notes that he intends to let the initial rainfall wash away salt buildup from the rigging before collecting water for drinking purposes.

Guarda su YouTube

Altro da Sven Yrvind

2 Masts down, ready for the trailer.set 2026Back to Work.set 2026A Non Bloated Boat in a Bloated World.set 2026No access to boat sat and sunday.set 2026

Da Sven Yrvind — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema