Sailing Catalpaβίντεο

DIY Projects are time consuming | Ep 392

21 Ιανουαρίου 2024 · 24 λεπτά · 11K προβολές

Τι καλύπτει αυτό το βίντεο

The crew of the Catalpa performs a major maintenance project to reinstall a generator into the engine bay. After cleaning the unit, Lee replaces the worn engine mounts, applies rust converter to corroded areas, and repaints the housing.9:21 He installs new sound insulation inside the generator cradle and reinforces the engine bay floor to support the weight.8:33 Because the generator is heavy and the engine bay is cramped, the crew uses a block and tackle rigged to the main boom to lift the unit from the deck into the cockpit.3:12 They then lower it through the companionway and maneuver it into the engine room using a combination of pulleys and manual lifting.18:06 Once positioned, the generator requires further work, including wiring harness fabrication, exhaust plumbing, and a full service.23:45 The project demonstrates the logistical challenges of moving heavy machinery through a boat's interior and the necessity of precise alignment before final mounting.

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Catalpa

the most sharks we have ever seenΟκτ 2026the clearest water we have ever seen...The TuamotusΟκτ 2026arriving to the most remote atolls on earth...the TuamotusΣεπ 2026they weren't expecting thisΣεπ 2026

Από Sailing Catalpa — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος