Sailing Catalpaβίντεο
DIY Projects are time consuming | Ep 392
21 Ιανουαρίου 2024 · 24 λεπτά · 11K προβολές
Τι καλύπτει αυτό το βίντεο
The crew of the Catalpa performs a major maintenance project to reinstall a generator into the engine bay. After cleaning the unit, Lee replaces the worn engine mounts, applies rust converter to corroded areas, and repaints the housing.9:21 He installs new sound insulation inside the generator cradle and reinforces the engine bay floor to support the weight.8:33 Because the generator is heavy and the engine bay is cramped, the crew uses a block and tackle rigged to the main boom to lift the unit from the deck into the cockpit.3:12 They then lower it through the companionway and maneuver it into the engine room using a combination of pulleys and manual lifting.18:06 Once positioned, the generator requires further work, including wiring harness fabrication, exhaust plumbing, and a full service.23:45 The project demonstrates the logistical challenges of moving heavy machinery through a boat's interior and the necessity of precise alignment before final mounting.
Περισσότερα από το Sailing Catalpa
Από Sailing Catalpa — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



