Sailing Catalpavideo

DIY Projects are time consuming | Ep 392

21. januar 2024 · 24 min · 11K visninger

Hva denne videoen dekker

The crew of the Catalpa performs a major maintenance project to reinstall a generator into the engine bay. After cleaning the unit, Lee replaces the worn engine mounts, applies rust converter to corroded areas, and repaints the housing.9:21 He installs new sound insulation inside the generator cradle and reinforces the engine bay floor to support the weight.8:33 Because the generator is heavy and the engine bay is cramped, the crew uses a block and tackle rigged to the main boom to lift the unit from the deck into the cockpit.3:12 They then lower it through the companionway and maneuver it into the engine room using a combination of pulleys and manual lifting.18:06 Once positioned, the generator requires further work, including wiring harness fabrication, exhaust plumbing, and a full service.23:45 The project demonstrates the logistical challenges of moving heavy machinery through a boat's interior and the necessity of precise alignment before final mounting.

Se på YouTube

Mer fra Sailing Catalpa

Sailing to the most remote waves in the tuamotusokt. 2026the most sharks we have ever seenokt. 2026the clearest water we have ever seen...The Tuamotusokt. 2026arriving to the most remote atolls on earth...the Tuamotussep. 2026

Fra Sailing Catalpa – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem