Sailing Catalpavídeo

DIY Projects are time consuming | Ep 392

21 de enero de 2024 · 24 min · 11K visitas

Qué cubre este vídeo

The crew of the Catalpa performs a major maintenance project to reinstall a generator into the engine bay. After cleaning the unit, Lee replaces the worn engine mounts, applies rust converter to corroded areas, and repaints the housing.9:21 He installs new sound insulation inside the generator cradle and reinforces the engine bay floor to support the weight.8:33 Because the generator is heavy and the engine bay is cramped, the crew uses a block and tackle rigged to the main boom to lift the unit from the deck into the cockpit.3:12 They then lower it through the companionway and maneuver it into the engine room using a combination of pulleys and manual lifting.18:06 Once positioned, the generator requires further work, including wiring harness fabrication, exhaust plumbing, and a full service.23:45 The project demonstrates the logistical challenges of moving heavy machinery through a boat's interior and the necessity of precise alignment before final mounting.

Ver en YouTube

Más de Sailing Catalpa

Sailing to the most remote waves in the tuamotusoct 2026the most sharks we have ever seenoct 2026the clearest water we have ever seen...The Tuamotusoct 2026arriving to the most remote atolls on earth...the Tuamotussept 2026

De Sailing Catalpa — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema