Sailing Catalpavideo

DIY Projects are time consuming | Ep 392

21 January 2024 · 24 min · 11K views

What this video covers

The crew of the Catalpa performs a major maintenance project to reinstall a generator into the engine bay. After cleaning the unit, Lee replaces the worn engine mounts, applies rust converter to corroded areas, and repaints the housing.9:21 He installs new sound insulation inside the generator cradle and reinforces the engine bay floor to support the weight.8:33 Because the generator is heavy and the engine bay is cramped, the crew uses a block and tackle rigged to the main boom to lift the unit from the deck into the cockpit.3:12 They then lower it through the companionway and maneuver it into the engine room using a combination of pulleys and manual lifting.18:06 Once positioned, the generator requires further work, including wiring harness fabrication, exhaust plumbing, and a full service.23:45 The project demonstrates the logistical challenges of moving heavy machinery through a boat's interior and the necessity of precise alignment before final mounting.

Watch on YouTube

More from Sailing Catalpa

the most sharks we have ever seenOct 2026the clearest water we have ever seen...The TuamotusOct 2026arriving to the most remote atolls on earth...the TuamotusSept 2026they weren't expecting thisSept 2026

From Sailing Catalpa — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue