Sven Yrvindβίντεο

All the Molds Done.

4 Οκτωβρίου 2026 · 6 λεπτά · 6K προβολές

Τι καλύπτει αυτό το βίντεο

Sven Yrvind completes the construction of the molds for his new 5.6-meter boat, an increase from his previous 5-meter design.1:03 He calculates the new station distances by dividing the total length, resulting in a series of measurements starting at 30 centimeters, followed by five 60-centimeter intervals, and ending with a 50-centimeter section.1:19 The build process currently awaits the arrival of aluminum profiles for the floor structure.2:00 Yrvind plans to incorporate an improved ventilation system and bulkhead design, drawing on engineering lessons learned from his 1974 Southern Ocean capsize and subsequent projects, including the Exlex and the ShineRunner.4:16 He intends to cut out the remaining molds and finalize the stem assembly once the materials arrive.3:51 The project represents an iterative development of his small-boat design philosophy, refining structural and ventilation components through successive builds.5:09

Παρακολουθήστε στο YouTube

Περισσότερα από το Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.Οκτ 2026Nervously Cutting the Divinycell Sheets.Οκτ 2026Trying to Get the Sheerline Right.Οκτ 2026More molds up.Οκτ 2026

Από Sven Yrvind — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος