Sven Yrvindvídeo
All the Molds Done.
4 de octubre de 2026 · 6 min · 6K visitas
Qué cubre este vídeo
Sven Yrvind completes the construction of the molds for his new 5.6-meter boat, an increase from his previous 5-meter design.1:03 He calculates the new station distances by dividing the total length, resulting in a series of measurements starting at 30 centimeters, followed by five 60-centimeter intervals, and ending with a 50-centimeter section.1:19 The build process currently awaits the arrival of aluminum profiles for the floor structure.2:00 Yrvind plans to incorporate an improved ventilation system and bulkhead design, drawing on engineering lessons learned from his 1974 Southern Ocean capsize and subsequent projects, including the Exlex and the ShineRunner.4:16 He intends to cut out the remaining molds and finalize the stem assembly once the materials arrive.3:51 The project represents an iterative development of his small-boat design philosophy, refining structural and ventilation components through successive builds.5:09
Más de Sven Yrvind
De Sven Yrvind — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



