Catamaran Mistertong βίντεο

#207 We’ve finally found our rhythm….

7 Απριλίου 2026 · 51 λεπτά · 6K προβολές

Hand points to mangrove bay at golden hour

Τι καλύπτει αυτό το βίντεο

Djé and Nad continue structural repairs on the forward crossbeam of their Outremer catamaran, focusing on removing damaged sections and reinforcing the nacelle area.0:57 After identifying rot in the original wood structure, they are stripping away compromised material, sanding, and applying epoxy and fiberglass to rebuild the mounting points for the trampoline and forestay.Watch The repair process involves creating custom fiberglass hinges for deck lockers to eliminate the need for mechanical fasteners, which they believe will prevent future water intrusion and structural failure.6:06

The crew works under the nacelle, managing significant fiberglass dust and coordinating tasks like sanding, filling, and applying epoxy primer.3:27 They plan to install trampoline attachments by bonding them directly to the new laminate.0:57 Despite the labor-intensive nature of the project and the physical toll of working in confined spaces, they report progress on the structural integrity of the forward beam. They emphasize that the new construction is significantly stronger than the original, which had suffered from water damage and rot around the metal fittings.48:08

Παρακολουθήστε στο YouTube

Περισσότερα από το Catamaran Mistertong

#250 I'm refused because of my outfit ...Σεπ 2026#249 The burden of paperwork ...Αυγ 2026#248 Despite the work, we're having a good time with friends ..Αυγ 2026#247 We're getting our driver's licenses...Αυγ 2026

Από Catamaran Mistertong — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος