Catamaran Mistertong video

#207 We’ve finally found our rhythm….

April 7, 2026 · 51 min · 6K views

Hand points to mangrove bay at golden hour

What this video covers

Djé and Nad continue structural repairs on the forward crossbeam of their Outremer catamaran, focusing on removing damaged sections and reinforcing the nacelle area.0:57 After identifying rot in the original wood structure, they are stripping away compromised material, sanding, and applying epoxy and fiberglass to rebuild the mounting points for the trampoline and forestay.Watch The repair process involves creating custom fiberglass hinges for deck lockers to eliminate the need for mechanical fasteners, which they believe will prevent future water intrusion and structural failure.6:06

The crew works under the nacelle, managing significant fiberglass dust and coordinating tasks like sanding, filling, and applying epoxy primer.3:27 They plan to install trampoline attachments by bonding them directly to the new laminate.0:57 Despite the labor-intensive nature of the project and the physical toll of working in confined spaces, they report progress on the structural integrity of the forward beam. They emphasize that the new construction is significantly stronger than the original, which had suffered from water damage and rot around the metal fittings.48:08

Watch on YouTube

More from Catamaran Mistertong

#250 I'm refused because of my outfit ...Sep 2026#249 The burden of paperwork ...Aug 2026#248 Despite the work, we're having a good time with friends ..Aug 2026#247 We're getting our driver's licenses...Aug 2026

From Catamaran Mistertong — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue