Catamaran Mistertong video

#207 We’ve finally found our rhythm….

7 aprile 2026 · 51 min · 6K visualizzazioni

Hand points to mangrove bay at golden hour

Cosa tratta questo video

Djé and Nad continue structural repairs on the forward crossbeam of their Outremer catamaran, focusing on removing damaged sections and reinforcing the nacelle area.0:57 After identifying rot in the original wood structure, they are stripping away compromised material, sanding, and applying epoxy and fiberglass to rebuild the mounting points for the trampoline and forestay.Watch The repair process involves creating custom fiberglass hinges for deck lockers to eliminate the need for mechanical fasteners, which they believe will prevent future water intrusion and structural failure.6:06

The crew works under the nacelle, managing significant fiberglass dust and coordinating tasks like sanding, filling, and applying epoxy primer.3:27 They plan to install trampoline attachments by bonding them directly to the new laminate.0:57 Despite the labor-intensive nature of the project and the physical toll of working in confined spaces, they report progress on the structural integrity of the forward beam. They emphasize that the new construction is significantly stronger than the original, which had suffered from water damage and rot around the metal fittings.48:08

Guarda su YouTube

Altro da Catamaran Mistertong

#264 We can see the end ...ott 2026#262 Installing the cleats on our davitott 2026#261 Finally some good news ....ott 2026#260 Little DIY projects to keep your spirits up...ott 2026

Da Catamaran Mistertong — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema