sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão
sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026

InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão

Catamaran Mistertong · vídeo

#207 We’ve finally found our rhythm….

7 de abril de 2026 · 51 min · 6K visualizações

Hand points to mangrove bay at golden hour

Ver no YouTube

O que este vídeo aborda

Djé and Nad continue structural repairs on the forward crossbeam of their Outremer catamaran, focusing on removing damaged sections and reinforcing the nacelle area.▶ 0:27 After identifying rot in the original wood structure, they are stripping away compromised material, sanding, and applying epoxy and fiberglass to rebuild the mounting points for the trampoline and forestay.▶ 0:00 The repair process involves creating custom fiberglass hinges for deck lockers to eliminate the need for mechanical fasteners, which they believe will prevent future water intrusion and structural failure.▶ 6:06 The crew works under the nacelle, managing significant fiberglass dust and coordinating tasks like sanding, filling, and applying epoxy primer.▶ 29:30 They plan to install trampoline attachments by bonding them directly to the new laminate.▶ 0:56 Despite the labor-intensive nature of the project and the physical toll of working in confined spaces, they report progress on the structural integrity of the forward beam. They emphasize that the new construction is significantly stronger than the original, which had suffered from water damage and rot around the metal fittings.▶ 48:08

Mais de Catamaran Mistertong

#233 The modification that changes everything07/2026#229 On a fait une erreur, l’ancre ne passe pas 06/2026#228 Is this the start of another job??06/2026#226 It’s looking good... we’re starting the first coats of paint!!!06/2026

De Catamaran Mistertong — veja o barco, a tripulação e todos os vídeos analisados do canal.

Reportar um problema
InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026