Tips from a Shipwrightβίντεο

Building the 23' V-Bottom Skiff - Episode 7: Laying down the sole

25 Δεκεμβρίου 2020 · 16 λεπτά · 71K προβολές

Τι καλύπτει αυτό το βίντεο

Louis Sauzedde and his assistant install the sole of a 23-foot V-bottom skiff by gluing 1 1/8-inch edge-grain Atlantic white cedar planks directly to the chine logs using pre-thickened epoxy.1:58 To secure the planks during the curing process without leaving permanent holes or hardened steel fasteners that could damage future planing tools, they use common eight-penny nails driven through washers.4:46 Once the epoxy sets, they remove the nails and washers, leaving a clean, glue-only bond.8:46 After the sole is secured, Sauzedde uses an electric plane to rough-cut the bevels along the hull’s transition angles, noting that the final fairing requires the keelson to be installed first to serve as a reference guide.12:21 A rabbit plane cleans the end grain of the sole planks to expose the seam between the chine and side planking, which acts as a control line for the final shaping.13:59

Παρακολουθήστε στο YouTube

Περισσότερα από το Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEΜαρ 2026Progressive BevelingΦεβ 20261958 Harley Davidson Panhead Motorcycle - For SaleΦεβ 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale LinesΙαν 2026

Από Tips from a Shipwright — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος