Tips from a Shipwrightvideo

Building the 23' V-Bottom Skiff - Episode 7: Laying down the sole

25. desember 2020 · 16 min · 71K visninger

Hva denne videoen dekker

Louis Sauzedde and his assistant install the sole of a 23-foot V-bottom skiff by gluing 1 1/8-inch edge-grain Atlantic white cedar planks directly to the chine logs using pre-thickened epoxy.1:58 To secure the planks during the curing process without leaving permanent holes or hardened steel fasteners that could damage future planing tools, they use common eight-penny nails driven through washers.4:46 Once the epoxy sets, they remove the nails and washers, leaving a clean, glue-only bond.8:46 After the sole is secured, Sauzedde uses an electric plane to rough-cut the bevels along the hull’s transition angles, noting that the final fairing requires the keelson to be installed first to serve as a reference guide.12:21 A rabbit plane cleans the end grain of the sole planks to expose the seam between the chine and side planking, which acts as a control line for the final shaping.13:59

Se på YouTube

Mer fra Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEmars 2026Progressive Bevelingfeb. 20261958 Harley Davidson Panhead Motorcycle - For Salefeb. 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale Linesjan. 2026

Fra Tips from a Shipwright – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem