Building the 23' V-Bottom Skiff - Episode 7: Laying down the sole
25 dicembre 2020 · 16 min · 71K visualizzazioni
Cosa tratta questo video
Louis Sauzedde and his assistant install the sole of a 23-foot V-bottom skiff by gluing 1 1/8-inch edge-grain Atlantic white cedar planks directly to the chine logs using pre-thickened epoxy.1:58 To secure the planks during the curing process without leaving permanent holes or hardened steel fasteners that could damage future planing tools, they use common eight-penny nails driven through washers.4:46 Once the epoxy sets, they remove the nails and washers, leaving a clean, glue-only bond.8:46 After the sole is secured, Sauzedde uses an electric plane to rough-cut the bevels along the hull’s transition angles, noting that the final fairing requires the keelson to be installed first to serve as a reference guide.12:21 A rabbit plane cleans the end grain of the sole planks to expose the seam between the chine and side planking, which acts as a control line for the final shaping.13:59
Altro da Tips from a Shipwright
Da Tips from a Shipwright — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.