Sailing Umaβίντεο

This Is the Last Line of Defense Before Our Boat Sinks | Step 475

22 Φεβρουαρίου 2026 · 39 λεπτά · 122K προβολές

Crew member pumps water from boat with forceful arc

Τι καλύπτει αυτό το βίντεο

Dan and Kika of the 9,000-kilogram vessel UMA 3.0 install high-capacity emergency bilge pumps to manage potential flooding across six watertight compartments.1:57 They select a high-volume manual pump that operates on both strokes and a 12-volt electric pump rated for 78 liters per minute.3:13 Before installation, they conduct bench tests using 75-liter buckets to verify flow rates and power draw, confirming the electric pump empties the volume in approximately 25 seconds.5:23 To prevent back-flooding, they install check valves on the discharge lines, noting a 10% reduction in flow efficiency.20:06 They drill two-inch through-hull fittings as high as possible on the hull, reinforcing the mounting points with epoxied G10 backing plates.16:32 The manual pump system incorporates a wastewater diverter valve, allowing one pump to service both the main salon and the cockpit locker.38:03 The installation ensures the boat can maintain buoyancy by isolating flooded compartments or rapidly evacuating water during an emergency.

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Uma

We're Finally Setting Sail Again!Σεπ 20264 Hours to Rig Solar for an 8-Month Solo CircumnavigationΣεπ 2026Solar Sponsor Backed Out Before Sailing Around the World !Σεπ 2026Our boat won’t look the same after this | Step 495Αυγ 2026

Από Sailing Uma — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος