Sailing Umavideo

This Is the Last Line of Defense Before Our Boat Sinks | Step 475

February 22, 2026 · 39 min · 121K views

Crew member pumps water from boat with forceful arc

What this video covers

Dan and Kika of the 9,000-kilogram vessel UMA 3.0 install high-capacity emergency bilge pumps to manage potential flooding across six watertight compartments.1:57 They select a high-volume manual pump that operates on both strokes and a 12-volt electric pump rated for 78 liters per minute.3:13 Before installation, they conduct bench tests using 75-liter buckets to verify flow rates and power draw, confirming the electric pump empties the volume in approximately 25 seconds.5:23 To prevent back-flooding, they install check valves on the discharge lines, noting a 10% reduction in flow efficiency.20:06 They drill two-inch through-hull fittings as high as possible on the hull, reinforcing the mounting points with epoxied G10 backing plates.16:32 The manual pump system incorporates a wastewater diverter valve, allowing one pump to service both the main salon and the cockpit locker.38:03 The installation ensures the boat can maintain buoyancy by isolating flooded compartments or rapidly evacuating water during an emergency.

Watch on YouTube

More from Sailing Uma

We're Finally Setting Sail Again!Sep 20264 Hours to Rig Solar for an 8-Month Solo CircumnavigationSep 2026Solar Sponsor Backed Out Before Sailing Around the World !Sep 2026Our boat won’t look the same after this | Step 495Aug 2026

From Sailing Uma — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue