Sailing Umavideo

This Is the Last Line of Defense Before Our Boat Sinks | Step 475

22 de febrero de 2026 · 39 min · 120K vistas

Crew member pumps water from boat with forceful arc

¿Qué cubre este video?

Dan and Kika of the 9,000-kilogram vessel UMA 3.0 install high-capacity emergency bilge pumps to manage potential flooding across six watertight compartments.1:57 They select a high-volume manual pump that operates on both strokes and a 12-volt electric pump rated for 78 liters per minute.3:13 Before installation, they conduct bench tests using 75-liter buckets to verify flow rates and power draw, confirming the electric pump empties the volume in approximately 25 seconds.5:23 To prevent back-flooding, they install check valves on the discharge lines, noting a 10% reduction in flow efficiency.20:06 They drill two-inch through-hull fittings as high as possible on the hull, reinforcing the mounting points with epoxied G10 backing plates.16:32 The manual pump system incorporates a wastewater diverter valve, allowing one pump to service both the main salon and the cockpit locker.38:03 The installation ensures the boat can maintain buoyancy by isolating flooded compartments or rapidly evacuating water during an emergency.

Ver en YouTube

Más de Sailing Uma

The ONE Thing We Disagreed on This Entire Refit | Step 494ago 2026We Owe You The Full Storyjul 2026We spent $10,000 on something Pretty | Step 493jul 2026We Covered Our Boat in Solar. Is It Enough? | Step 492 (Part 3)jul 2026

De Sailing Uma — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema