Sailing Umavideo

This Is the Last Line of Defense Before Our Boat Sinks | Step 475

22 febbraio 2026 · 39 min · 120K visualizzazioni

Crew member pumps water from boat with forceful arc

Cosa tratta questo video

Dan and Kika of the 9,000-kilogram vessel UMA 3.0 install high-capacity emergency bilge pumps to manage potential flooding across six watertight compartments.1:57 They select a high-volume manual pump that operates on both strokes and a 12-volt electric pump rated for 78 liters per minute.3:13 Before installation, they conduct bench tests using 75-liter buckets to verify flow rates and power draw, confirming the electric pump empties the volume in approximately 25 seconds.5:23 To prevent back-flooding, they install check valves on the discharge lines, noting a 10% reduction in flow efficiency.20:06 They drill two-inch through-hull fittings as high as possible on the hull, reinforcing the mounting points with epoxied G10 backing plates.16:32 The manual pump system incorporates a wastewater diverter valve, allowing one pump to service both the main salon and the cockpit locker.38:03 The installation ensures the boat can maintain buoyancy by isolating flooded compartments or rapidly evacuating water during an emergency.

Guarda su YouTube

Altro da Sailing Uma

The ONE Thing We Disagreed on This Entire Refit | Step 494ago 2026We Owe You The Full Storylug 2026We spent $10,000 on something Pretty | Step 493lug 2026We Covered Our Boat in Solar. Is It Enough? | Step 492 (Part 3)lug 2026

Da Sailing Uma — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema